Wednesday, May 25, 2011

25 March 2011 - The New Dam




The man has decided to start a fishing lodge here instead of building some cottages and dealing with crappy tenants, and so the building of the dam commences. With great enthusiasm and admittedly, a whole lot of vision his part.

After two giant TLB's have scraped away what I believe to be a giant crater, and some river water is filtering in, we stand and gaze at the dam. And gaze some more. And then the man realises that the original dam wall was WAY further down and at least 15m higher than he first thought. What we have done is built a POND that may very well be washed away with the first threat of rain.

Back to the drawing board.

My nerves.....LOL!

No comments:

Post a Comment